Navigating through the complexities of acquiring or altering electric service necessitates a thorough understanding of the required documentation and procedures, particularly for those interfacing with PECO (Philadelphia Electric Company). The PECO Service and Meter Application form, a critical document for residential and commercial customers alike, encapsulates the intricacies of applying for a new service, modifying an existing service, or requesting meter adjustments or upgrades. Designed with detailed instructions, this form guides applicants in providing essential information, including customer identification, service location details, and the specifics of the requested service such as type, characteristics, and load specifications. It also requires details about the construction status, metering information, and any relevant contractor or electrician information, ensuring that every aspect of the electric service request is comprehensively covered. The form emphasizes the importance of accurate and complete submissions, as any omissions can lead to delays in processing. Additionally, it outlines compliance requirements with PECO Electric Service Requirements and the necessity of passing inspections by approved agencies. Moreover, the document details how to select the appropriate PECO regional office for submission, thereby streamlining the application process. This meticulous approach not only facilitates the efficient processing of requests but also underscores PECO's commitment to safety, regulatory compliance, and customer service excellence.

Document Preview

INSTRUCTIONS FOR PREPARING APPLICATIONS FOR ELECTRIC SERVICE & METER

Please refer to the sample application while reviewing the following notes. The letters below correspond with those on the sample. NOTE: THE "BLANK" FORM IS BELOW THE "SAMPLE" FORM

A.After reading the instructions at the top of the application, locate the PECO regional office in which the service is requested. Check the appropriate box and mail or fax the completed application to the appropriate regional office.

B.Complete the fields for customer's name and service location. Customer's Driver's License Number or Social Security Number is now required.

Note: (*) Include PECO Energy pole # and/or Lot # only if applicable.

(**) Use the address of the service when applying for underwriter's inspection.

C.Complete the fields for customer's PECO billing address or account number (within last 60 days).

D.Complete fields regarding you as the electrician or contractor, and indicate where you would like the reply sent. The Electrician/Builder Tax Identification number is now required. Also, please include the date you would like the reply returned to you.

E.Indicate your current construction status, and include the date PECO service is requested. Please avoid using "as soon as possible".

F. thru J. Indicate the following:

Type of Request

Type of Service (include number of units and area per unit)

Service Characteristics

Meter Information

Heating/Air Conditioning

K.Complete the table concerning the load characteristics of the service. For each applicable type of load, provide: 1) Connected KW, 2) Maximum Summer KW Demand, and 3) Maximum Winter KW Demand.

L.Complete the table concerning motor information.

M.If compensated metering will be used, indicate totalizer and general load (KW).

N.Include any additional comments.

O.

Application MUST be signed and dated.

Forms Rev. 5/18

PECO

Application for Electric Service & Meter

M-24175 (front) Rev. 5/18

INSTRUCTIONS:

Please complete the front page of this request and return to the PECO Regional Office (listed below) in the area service is required. Incomplete information may result in a delay in processing.

All work must comply with PECO Electric Service Requirements manual and be inspected by an approved inspection agency. (City of Philadelphia requests may be shared with Licenses & Inspections). Not all service voltages are available in all areas. Before purchasing electrical equipment or proceeding with any wiring, information regarding service availability and meter location should be obtained from the company.

A credit application and agreement must be completed if the customer has not had PECO service within the last 60 days. The company reserves the right to cancel this request if no further communication is received from the customer within 90 days of PECO's response date.

NOTE: IF DEMOLISHING A BUILDING AND NEED PECO TO REMOVE ELECTRIC OR GAS FACILITIES, PLEASE CALL 8-1-1 (PA ONE CALL) FOR DEMOLITION REQUEST

NEW BUSINESS SERVICES (1-800-454-4100) http://www.peco.com

PHILADELPHIA

 

 

 

DELAWARE & CHESTER COUNTIES

BUCKS & MONTGOMERY

 

 

 

 

 

 

 

NEW RESIDENTIAL

 

 

 

 

 

 

COUNTY

 

 

 

1050 W. Swedesford Rd.

COUNTIES

 

 

 

 

 

 

 

 

 

CONSTRUCTION

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

A

 

 

 

830 S. Schuylkill Ave.

Berwyn, PA 19312

 

 

 

 

400 Park Ave.

 

 

 

 

 

 

 

 

 

(All Counties)

 

 

 

 

 

 

 

 

 

 

Philadelphia, PA 19146

Email:DelChesterServiceApplications@ex

Warminster, PA 18974

 

 

 

 

 

 

 

 

 

400 Park Ave.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Email:PhilaNewBusiness@e

eloncorp.com

 

 

 

 

 

 

 

Email:Bucksmontserviceapplications@e

Warminster, PA

18974

 

 

 

 

 

 

 

 

 

xeloncorp.com

 

 

 

Fax # (610) 725-1416

 

 

 

 

xeloncorp.com

 

 

 

 

 

 

 

 

 

Email:NRCGMETERORDERS@P

Fax # (215) 731-2327

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Fax # (215) 956-3240

 

 

 

 

 

 

 

 

 

eco-Energy.com

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Fax # (215) 956-3380

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CUSTOMER NAME

 

 

 

 

 

 

 

 

 

 

 

 

Tax ID # or SSN

 

 

TYPE OF REQUEST

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

New Service

 

 

Load Increase/Decrease

 

Reintroduction of Service

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Temporary Service

Upgrade/Changes

 

Demolition (Remove

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Separation of Wiring

Service Relocation

 

 

 

Service)

 

 

 

 

 

 

** ADDRESS TO BE SERVED

 

 

B

 

 

 

 

 

APARTMENT/LOT #

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

F

 

Make-Safe (De-

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

energize/Cover)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CITY, STATE

 

 

 

 

 

 

 

 

 

 

 

 

ZIP CODE

 

 

 

 

 

 

TYPE OF SERVICE: Please include site plan.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

RESIDENTIAL

 

 

 

 

 

 

 

 

 

 

 

 

COMMERICAL

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Single House

Mobile Home

Store

 

 

 

 

Office

 

 

 

G

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Apartment

Modular Home

Industrial

 

 

 

 

Warehouse

 

 

 

UTILITY POLE#

SUBDIVISION/DEVELOPMENT

 

 

TOWNSHIP/MUNICIPALITY/WARD#

 

Duplex

Town House

Restaurant

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Other _____________________________

Other _____________________________

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Area of Building _______________________ Sq. Ft.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

* If Applicable

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SERVICE CHARACTERISTICS:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

** Please use this address when applying for underwriter’s inspection

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

PHASE

 

VOLTS

 

 

 

WIRES

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Underground

 

 

Aerial

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CUSTOMERS BILLING ADDRESS

 

C

 

 

-OR-

 

 

PECO ENERGY ACCOUNT#

 

 

 

 

 

 

 

 

 

 

3

 

 

240

 

 

 

3

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

AMPS _________

 

 

 

 

 

3

 

 

120/240

 

 

 

4

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

PHASE

 

VOLTS

 

WIRES

 

 

 

 

 

 

 

3

 

 

120/208

 

 

 

4

 

 

 

 

CITY, STATE

 

 

ZIP CODE

 

 

 

 

 

TELE. #

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1

 

120

 

 

2

 

 

 

 

 

 

 

 

3

 

 

277/480

 

 

 

4

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1

 

120/240

 

3

 

 

 

 

 

 

 

 

3

 

 

13200

 

 

 

3 or 4

SEND REPLY TO:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2

 

120/240

 

5

 

 

 

 

 

 

 

 

3

 

 

33000

 

 

 

3 or 4

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ELECTRICIAN’S OR BUILDER’S NAME

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

METER INFO:

Two Meters, Commercial (General/Totalizer)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

I

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Single Meter Required

 

 

 

 

 

 

 

Multiple Meter Total No. _____________

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ADDRESS

 

 

 

 

 

 

 

 

 

 

Reply Requested by:

 

 

HEATING/AIR CONDITIONING:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

D

 

 

 

 

 

 

/

/

 

 

 

Central Air _____ Tons

 

Resistance

 

 

 

J

 

Heat Pump _____ Tons

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Natural Gas

 

 

 

Propane

 

 

 

 

Type Back-Up _________

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Other ________________

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

City, State

 

 

 

 

 

 

 

 

 

 

ZIP CODE

 

 

 

 

 

 

CHARACTERISTICS OF NEW OR ADDITIONAL LOAD:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CONNECTED

 

PECO ENERGY USE ONLY (DEMAND)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TYPE

 

LOAD (kW)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TELE. #

 

 

 

 

 

 

 

 

 

 

E-MAIL ADDRESS

 

 

 

 

 

SUMMER (kW)

 

 

 

Winter (kW)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

LIGHTING

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

K

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CURRENT CONSUTRCTION STATUS:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

HEATING

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Not Started – Date Customer Will Start Work: _____/_____/_____

In Progress Completed

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

AIR/COND.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Approximate Date Service Requested: _____/_____/_____

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

E

 

 

 

TANKLESS WATER HTR

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

MISC

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CUSTOMER COMMENTS/ DESCRIPTIN OF WORK

 

 

N

 

 

 

 

 

 

TOTAL

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Include single line diagram and substation arrangement if appropriate.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

LARGEST MOTOR SPECIFICATIONS

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

O

 

 

 

 

 

 

 

 

 

 

QUANTITY

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TOTALIZER LOAD

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SIZE (HP)

 

 

 

 

 

 

 

 

 

 

L

 

 

 

 

 

 

 

 

M

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

LOCKED ROTOR CURRENT

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

KW

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

MOTOR CODE LETTER

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SUBMITTED BY: _________________________________ DATE: ______________________

 

PHASE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

GENERAL LOAD

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

VOLTAGE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

PECO

Application for Electric Service & Meter

M-24175 (front) Rev. 5/18

Enclosures: Site Plans Single Line Diagram Substation Arrangement

FREQ. OF STARTING (PER HR.)

PURPOSE

KW

INFORMATION BELOW WILL BE FILLED IN BY PECO:

 

 

 

 

 

 

 

 

 

 

 

Service Request No.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

BUS/MAJ ACCT REP

 

TELEPHONE

DATA RECEIVED

DESIGNER

 

 

 

 

 

DATA RECEIVED

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TELEPHONE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

POL SUB

 

RATE

 

RIDER

 

CONTRACT LIMITS

 

SIC NUMBER

 

T

 

DATE REPLY

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

NUMBER

 

COMPLETED

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

AMPS

 

WIRES

 

VOLTAGE

PHASE

 

 

CIRCUIT

 

 

 

 

 

C-QUAD

 

T-QUAD

LOAD (KVA)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SUMMER_____WINTER ____

SERVICE CHARACTERISITICS – Select One from Each

 

 

 

 

 

 

 

 

 

POLE # / MH # LOCATION

 

CUT THROUGH DATE

SERVICE TYPE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Aerial

 

 

 

Underground

URD

 

 

 

 

 

 

 

 

 

 

 

 

 

 

RATE:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Residential

 

 

Comm (Non-

 

Comm (Demand)

 

HT/PD

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Demand)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

GENERATION PROCUREMENT CLASS:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Class 1 (Residential)

 

 

 

Class 2 (Commercial, less than 100kW)

 

 

 

 

 

 

 

 

 

 

 

 

Class 3 (Commercial, 100kW to 500kW)

 

Class 4 (Commercial, greater than 500kW)

 

 

 

 

 

 

 

 

 

 

NOTE: The customer’s Initial Procurement Class will be determined by PECO, based on peak load

 

 

 

 

 

 

estimates for the first year of service. The customer’s Procurement Class will be adjusted each year,

 

 

 

 

 

 

based on actual usage.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

METER TYPE:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

KWH

 

 

IND. DEMAND

RECORDER

TOU

 

 

 

 

 

 

 

 

 

 

SERVICE PHASING:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SINGLE PHASE

TWO PHASE

THREE PHASE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SERVICE REQUIREMENTS:

 

 

 

 

 

 

METERING LOCATION AND REQUIREMENTS:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Present Location:

Meter # _______________

CTs-

PTs-________

Present Service OK

Loop Only

 

 

 

 

 

 

 

 

 

 

 

 

 

 

________

 

 

Taps Only

 

 

See Job # ________________________________

 

Indoo

Outdoor

 

On ________ Wall, ________ Ft. From ________ Wall, ________ ft. Above

 

 

 

 

 

 

 

 

 

 

r

 

 

 

 

 

Ground

 

 

 

ADVANCE NOTIFICATIONS:

 

 

 

 

 

 

 

 

 

 

 

 

 

CUSTOMER BILLING:

 

 

 

Underwriter’s Cert.

 

Yes

No

 

 

 

 

 

 

 

 

 

Advance Billing

Yes

 

$_______________

Required

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Required

 

 

 

__

Customer to Trench

 

Yes

No

 

 

 

 

 

 

 

 

 

 

 

 

No Customer

 

 

Permit Required

 

Yes

No

State

Other

 

 

 

 

 

 

 

Charges:

$_______________

 

 

 

 

 

 

 

 

 

 

 

__

 

 

 

 

 

 

 

 

_______________________

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Cust. #

 

 

Date

 

 

ACT 222 Cert. Required

 

Yes #

 

 

No

N/A

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

_________________________

 

___________________________

 

 

 

_____________

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

BTCO #

 

 

Date

 

 

PA One Call #

 

 

 

 

 

 

 

Date

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

________________________

 

___________________________

___________________________

 

 

 

 

__________________________

 

 

 

 

 

 

 

CATV #

 

 

Date

 

 

Gas

BTCO

CATV

Other

 

Date

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

________________________

 

___________________________

 

 

 

 

 

___________________

__________________________

 

 

 

 

 

 

 

 

Other

 

 

Date

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

__________________________

 

___________________________

SKETCH / INSTRUCTIONS

PECO

Application for Electric Service & Meter

M-24175 (front) Rev. 5/18

INSTRUCTIONS:

Please complete the front page of this request and return to the PECO Regional Office (listed below) in the area service is required. Incomplete information may result in a delay in processing.

All work must comply with PECO Electric Service Requirements manual and be inspected by an approved inspection agency. (City of Philadelphia requests may be shared with Licenses & Inspections). Not all service voltages are available in all areas. Before purchasing electrical equipment or proceeding with any wiring, information regarding service availability and meter location should be obtained from the company.

A credit application and agreement must be completed if the customer has not had PECO service within the last 60 days. The company reserves the right to cancel this request if no further communication is received from the customer within 90 days of PECO's response date.

NOTE: IF DEMOLISHING A BUILDING AND NEED PECO TO REMOVE ELECTRIC OR GAS FACILITIES, PLEASE CALL 8-1-1 (PA ONE CALL) FOR DEMOLITION REQUEST

NEW BUSINESS SERVICES (1-800-454-4100) http://www.peco.com

PHILADELPHIA COUNTY

DELAWARE & CHESTER COUNTIES

BUCKS & MONTGOMERY

 

 

 

 

 

NEW RESIDENTIAL

 

 

 

830 S. Schuylkill Ave.

1050 W. Swedesford Rd.

 

COUNTIES

 

 

 

 

 

 

 

 

CONSTRUCTION

 

 

 

Philadelphia, PA 19146

Berwyn, PA 19312

 

400 Park Ave.

 

 

 

 

 

 

 

 

(All Counties)

 

 

 

 

 

 

Email:PhilaNewBusiness@ex

Email:DelChesterServiceApplications@exe

Warminster, PA 18974

 

 

 

 

 

 

400 Park Ave.

 

 

 

 

 

 

eloncorp.com

 

 

loncorp.com

 

 

 

Email:Bucksmontserviceapplications@e

 

Warminster, PA 18974

 

 

 

Fax # (215) 731-2327

Fax # (610) 725-1416

 

xeloncorp.com

 

 

 

 

 

 

 

 

Email:NRCGMETERORDERS@P

 

 

 

 

 

 

 

 

 

 

Fax # (215) 956-3240

 

 

 

 

 

 

eco-Energy.com

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Fax # (215) 956-3380

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CUSTOMER NAME

 

 

 

 

Tax ID # or SSN

 

 

 

TYPE OF REQUEST

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

New Service

 

 

Load Increase/Decrease

 

Reintroduction of Service

 

 

 

 

 

 

 

 

 

 

 

 

Temporary Service

Upgrade/Changes

 

Demolition (Remove

** ADDRESS TO BE SERVED

 

 

APARTMENT/LOT #

 

 

 

Separation of Wiring

Service Relocation

 

 

Service)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Make-Safe (De-

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

energize/Cover)

 

 

 

CITY, STATE

 

 

 

 

ZIP CODE

 

 

 

TYPE OF SERVICE: Please include site plan.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

RESIDENTIAL

 

 

 

 

 

 

 

 

 

COMMERICAL

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Single House

Mobile Home

Store

 

 

 

 

Office

 

 

 

UTILITY POLE#

SUBDIVISION/DEVELOPMENT

 

TOWNSHIP/MUNICIPALITY/WARD#

 

Apartment

Modular Home

Industrial

 

 

 

 

Warehouse

 

 

 

 

 

 

 

 

 

 

 

 

Duplex

Town House

Restaurant

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Other _____________________________

Other _____________________________

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Area of Building _______________________ Sq. Ft.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

*

If Applicable

 

 

 

 

 

 

 

 

 

SERVICE CHARACTERISTICS:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

**

Please use this address when applying for underwriter’s inspection

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

PHASE

 

VOLTS

 

WIRES

 

 

 

 

 

 

 

 

 

 

 

 

 

Underground

 

 

Aerial

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CUSTOMERS BILLING ADDRESS

 

 

PECO ENERGY ACCOUNT#

 

 

 

 

 

 

 

 

 

 

3

 

 

240

 

3

 

 

 

 

 

 

 

-OR-

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

AMPS _________

 

 

 

 

3

 

 

120/240

 

4

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

PHASE

 

VOLTS

 

WIRES

 

 

 

 

 

3

 

 

120/208

 

4

 

 

CITY, STATE

 

ZIP CODE

 

TELE. #

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1

 

120

 

 

2

 

 

 

 

 

3

 

 

277/480

 

4

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1

 

120/240

 

3

 

 

 

 

 

3

 

 

13200

 

3 or 4

 

SEND REPLY TO:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2

 

120/240

 

5

 

 

 

 

 

3

 

 

33000

 

3 or 4

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ELECTRICIAN’S OR BUILDER’S NAME

 

 

 

 

 

 

 

METER INFO:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Two Meters, Commercial (General/Totalizer)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Single Meter Required

 

 

 

 

 

Multiple Meter Total No. _____________

ADDRESS

 

 

 

 

Reply Requested by:

 

 

 

HEATING/AIR CONDITIONING:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

/

/

 

 

Central Air _____ Tons

 

Resistance

 

 

 

 

 

Heat Pump _____ Tons

 

 

 

 

 

 

 

 

 

Natural Gas

 

 

 

Propane

 

 

 

 

 

Type Back-Up _________

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Other ________________

CITY, STATE

 

 

 

 

ZIP CODE

 

 

 

CHARACTERISTICS OF NEW OR ADDITIONAL LOAD:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CONNECTED

 

PECO ENERGY USE ONLY (DEMAND)

TELE. #

 

 

 

 

E-MAIL ADDRESS #

 

 

 

 

 

TYPE

 

LOAD (kW)

 

SUMMER (kW)

 

Winter (kW)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

LIGHTING

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CURRENT CONSUTRCTION STATUS:

 

 

 

 

 

 

 

HEATING

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Not Started – Date Customer Will Start Work: _____/_____/_____  In Progress Completed

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

AIR/COND.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Approximate Date Service Requested: _____/_____/_____

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TANKLESS WATER HTR

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

MISC

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CUSTOMER COMMENTS/ DESCIPTION OF WORK:

 

 

 

TOTAL

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Include single line diagram and substation arrangement if appropriate.

 

 

 

 

 

 

 

 

 

 

 

 

LARGEST MOTOR SPECIFICATIONS

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

QUANTITY

 

 

 

 

 

 

 

 

 

 

 

 

 

TOTALIZER LOAD

 

 

 

 

 

 

 

 

 

 

 

 

SIZE (HP)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

LOCKED ROTOR CURRENT

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

KW

 

 

 

 

 

 

 

 

 

 

 

 

 

 

MOTOR CODE LETTER

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SUBMITTED BY: _________________________________ DATE: ______________________

 

 

PHASE

 

 

 

 

 

 

 

 

 

 

 

 

 

GENERAL LOAD

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

VOLTAGE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

PECO

Application for Electric Service & Meter

M-24175 (front) Rev. 5/18

Enclosures: Site Plans Single Line Diagram Substation Arrangement

FREQ. OF STARTING (PER HR.)

PURPOSE

KW

INFORMATION BELOW WILL BE FILLED IN BY PECO:

 

 

 

 

 

 

 

 

 

 

 

Service Request No.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

BUS/MAJ ACCT REP

 

TELEPHONE

 

DATA RECEIVED

DESIGNER

 

 

 

 

 

 

DATA RECEIVED

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TELEPHONE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

POL SUB

 

RATE

 

RIDER

 

CONTRACT LIMITS

 

SIC NUMBER

 

 

T NUMBER

 

DATE REPLY

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

COMPLETED

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

AMPS

 

WIRES

 

VOLTAGE

PHASE

 

CIRCUIT

 

 

 

 

 

C-QUAD

 

T-QUAD

LOAD (KVA)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SUMMER_____WINTER

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

____

SERVICE CHARACTERISITICS – Select One from Each

 

 

 

 

 

 

 

 

 

POLE # / MH # LOCATION

 

 

CUT THROUGH DATE

SERVICE TYPE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Aerial

 

 

 

Underground

 

URD

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

RATE:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Residential

 

 

Comm (Non-Demand)

Comm (Demand)

 

HT/PD

 

 

 

 

 

 

 

 

 

 

 

 

GENERATION PROCUREMENT CLASS:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Class 1 (Residential)

 

 

 

Class 2 (Commercial, less than 100kW)

 

 

 

 

 

 

 

 

 

 

 

 

Class 3 (Commercial, 100kW to 500kW)

 

Class 4 (Commercial, greater than 500kW)

 

 

 

 

 

 

 

 

 

 

 

 

NOTE: The customer’s Initial Procurement Class will be determined by PECO, based on peak load estimates for

 

 

 

 

 

 

 

 

 

 

the first year of service. The customer’s Procurement Class will be adjusted each year, based on actual usage.

 

 

 

 

 

 

 

 

 

 

METER TYPE:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

KWH

 

 

IND. DEMAND

 

RECORDER

TOU

 

 

 

 

 

 

 

 

 

 

 

 

SERVICE PHASING:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SINGLE PHASE

TWO PHASE

 

THREE PHASE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SERVICE REQUIREMENTS:

 

 

 

 

 

 

METERING LOCATION AND REQUIREMENTS:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Present Location:

Meter # _______________

 

CTs- ________

PTs-________

Present Service OK

Loop Only

 

 

 

 

 

Indoor Outdoor

On ________

Wall, ________ Ft. From ________ Wall, ________ ft. Above Ground

Taps Only

 

 

See Job # _________________________________

 

ADVANCE NOTIFICATIONS:

 

 

 

 

 

 

 

 

 

 

 

CUSTOMER BILLING:

 

 

 

 

 

 

 

Underwriter’s Cert. Required

 

Yes

No

 

 

 

 

 

 

 

Advance Billing Required Yes

 

 

$_________________

Customer to Trench

 

Yes

No

 

 

 

 

 

 

 

 

 

 

 

 

No Customer Charges: $_________________

Permit Required

 

 

 

Yes

No

State

Other _______________________

Cust. # _________________________

Date ___________________________

ACT 222 Cert. Required

 

Yes # _____________

No

N/A

 

 

 

 

BTCO # ________________________

Date ___________________________

PA One Call # ___________________________

 

 

Date __________________________

CATV # ________________________

Date ___________________________

Gas

BTCO

CATV

Other ___________________

Date __________________________

Other __________________________

Date ___________________________

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SKETCH / INSTRUCTIONS

Document Attributes

Fact Name Detail
Form Revision Date The PECO Application for Electric Service & Meter was revised in May 2018.
Application Identification The form is identified by M-24175 (front) Rev. 5/18.
Mandatory Information Customer's name, Tax ID or SSN, type of request, and service location are required fields.
Additional Information for Service Details such as type of service, service characteristics, heating/air conditioning, new/additional load characteristics, and motor information are requested for processing.
Documentation Enclosures may include site plans, single line diagrams, and substation arrangement if applicable.
Governing Law for Compliance All work must comply with PECO Electric Service Requirements manual and be inspected by an approved inspection agency. In the City of Philadelphia, requests may be shared with Licenses & Inspections.
Service Voltages and Precautions Not all service voltages are available in all areas. Information regarding service availability and meter location should be obtained from the company before proceeding.
Conditions for Cancelation The company reserves the right to cancel the request if no further communication is received from the customer within 90 days of PECO's response date.

How to Fill Out Peco Service And Meter Application

When preparing to submit the PECO Service And Meter Application form, applicants are stepping towards establishing or modifying their electric service. This application is essential for requests such as new service installation, service upgrades, or any changes requiring PECO's involvement. The process requires detailed information about the project, ensuring PECO can adequately meet the service needs. Following the steps outlined below can streamline the process, reducing potential delays and ensuring compliance with necessary requirements.

  1. Start by reading the instructions provided at the top of the application form to gain an understanding of the application process and requirements.
  2. Determine the PECO regional office that corresponds to the service location. Check the appropriate box on the form and be prepared to mail or fax the completed application to the selected office.
  3. Fill in the customer’s name, the service location address, and the Customer's Driver's License Number or Social Security Number. Include the PECO Energy pole number and/or lot number if applicable. When applying for an underwriter’s inspection, use the service address.
  4. Provide the customer’s PECO billing address or account number if there has been PECO service within the last 60 days.
  5. Enter details for the electrician or contractor responsible for the work, including where the response should be sent and the Electrician/Builder Tax Identification number. Specify the desired date for the reply.
  6. Indicate the current construction status and the date when PECO service is requested. Avoid using vague terms like "as soon as possible".
  7. Specify the type of request, type of service, service characteristics, meter information, and details about heating/air conditioning.
  8. Complete the table concerning the load characteristics of the service. For each type of load (e.g., lighting, heating, air conditioning), provide the connected KW, maximum summer KW demand, and maximum winter KW demand.
  9. Fill in the motor information table, detailing the largest motor specifications, including quantity, totalizer load size, locked rotor current, and motor code letter.
  10. If compensated metering will be used, indicate the totalizer and general load (KW).
  11. Include any additional comments or description of work in the provided section.
  12. Ensure the application is signed and dated by the person submitting the form.
  13. Check if enclosures like site plans, single line diagrams, or substation arrangements are required for your application and include them if necessary.

After you have completed all the necessary fields in the application, review your entries for accuracy and comprehensiveness. Once ensured, submit the application along with any required attachments to the PECO regional office you identified in step 2. This submission will kick-start the review process, and a PECO representative will contact you for further steps or if additional information is needed. Remember, incomplete or inaccurate information can cause delays, so thoroughness is crucial.

More About Peco Service And Meter Application

Here are some frequently asked questions about the PECO Service And Meter Application form:

  1. How do I start the application process for electric service and meter with PECO?

    To begin the application process, you need to first read the instructions at the top of the application form. Then, find the PECO regional office that corresponds to the location where the service is requested. Make sure to check the correct box for that office and send your completed application either by mail or fax to the appropriate address or number provided.

  2. What information is required to fill out the application?

    The form requires several pieces of information from you:

    • Your name and the service location.
    • A Driver's License Number or Social Security Number is mandatory.
    • For customer billing, either a PECO billing address or account number (if available within the last 60 days).
    • As the electrician or contractor, your tax identification number, and details about where you want the reply to be sent, including the preferred date.
    • Details about the type of service requested, the characteristics of the service, meter information, and heating/air conditioning specifics.
    • Load characteristics, including connected KW, maximum summer KW demand, and maximum winter KW demand, if applicable.
    • Motor information and any additional comments you might have.
  3. What happens if my application is incomplete?

    If your application lacks essential information, it might lead to a delay in processing. PECO emphasizes providing complete and accurate information to avoid such delays. Ensure every required field is filled out, and double-check your form before submission.

  4. Is there a deadline to communicate with PECO after submitting my application?

    Yes, after PECO has responded to your service request, you must communicate any further information or respond to them within 90 days. Failing to do so could result in the cancellation of your request. This measure ensures efficient processing and allocation of resources.

Common mistakes

Filling out the PECO Service and Meter Application form is a crucial step in ensuring your electrical service needs are met accurately and in a timely manner. However, errors or oversights can lead to delays or complications in the process. Here are 10 common mistakes people make when completing this form:

  1. Not checking the appropriate regional office box: It is essential to correctly identify and check the box for the PECO regional office where the service is requested to ensure the application is processed by the correct department.
  2. Incomplete customer information: Leaving fields for the customer's name, service location, or required identification numbers (Driver's License Number or Social Security Number) incomplete can halt the application process.
  3. Omitting PECO Energy pole # or Lot #: If applicable, failing to include the PECO Energy pole # or Lot # can lead to issues in accurately locating the service site which may delay the service provisioning.
  4. Incorrect billing address or account number: Not providing a current PECO billing address or an account number (within the last 60 days) can cause billing issues and service delays.
  5. Neglecting electrician or contractor information: It is crucial to complete all fields regarding the electrician or contractor, including the Tax Identification number and where the reply should be sent.
  6. Vagueness about construction status or service request date: Indicating the construction status and specifying a service request date instead of noting "as soon as possible" helps in planning and prioritizing your application.
  7. Service specifics not thoroughly defined: Not properly indicating the type of request, service, service characteristics, meter information, or heating/air conditioning needs can result in inadequate or incorrect service setup.
  8. Load characteristics and motor information left blank: Failing to complete the sections on load characteristics and motor information may lead to the installation of inappropriate service capabilities.
  9. Leaving the comments section blank: Any additional comments, descriptions of work, or specific requests are pivotal for understanding the full scope of the service needed. Omissions here can overlook critical details.
  10. Application unsigned or undated: An unsigned or undated application is incomplete. This can prevent the application from being processed as it officially confirms the request for service.

By paying careful attention to these details, applicants can avoid delays in service and ensure that their electrical needs are met in alignment with their project's timeline and requirements.

Documents used along the form

When applying for PECO service and getting a new meter installed, it's important to have all your ducks in a row. Apart from the PECO Service And Meter Application form, there are several other documents and forms that you might need to gather or fill out. Each serves its own purpose in ensuring that your electric service setup goes smoothly. Here's a rundown of these key documents:

  • Site Plans: Detailed drawings showing the layout of the property, including the location where electric service will be installed. It helps PECO understand the specifics of your site for proper service installation.
  • Single Line Diagram: A simplified electrical drawing showing the configuration of the electric service, including meter placement and main panels. This is crucial for PECO to design and approve the service setup.
  • Substation Arrangement: If applicable, a diagram showing the connection to a substation may be required. This is especially relevant for larger commercial or industrial installations.
  • Credit Application and Agreement: For customers who have not had PECO service in the last 60 days, a credit application ensures that you’re set up for billing. The agreement outlines the terms of service and payment.
  • ACT 222 Certification: Required in certain situations, this certification acknowledges certain compliance aspects relevant to the electric installation.
  • Proof of Underwriter's Inspection: An approved inspection agency must inspect the electrical work before PECO can connect service. This document shows that the installation meets all safety standards and regulations.

Getting electric service set up involves navigating through some paperwork, but each document plays a key role in the process. Whether it's showing the specifics of your property with a site plan, or proving your electrical work is up to code with an underwriter's inspection, these documents help PECO provide you with the proper service. Making sure you have these documents ready can make your application process smoother and faster.

Similar forms

  • The Utility Service Installation Request form is similar to the PECO Service And Meter Application form in a few ways. Both forms are used to initiate the provision of utility services to a new or modified site. Individuals must provide detailed information about the installation location, the type of service required (e.g., residential or commercial), and specific service characteristics such as voltage and phase. Also, both forms typically require the customer's contact information and identification details to process the request smoothly.

  • An Electrical Permit Application has a resemblance to the PECO Service And Meter Application form in its purpose to ensure that electrical installations adhere to local codes and regulations. Similarities include the requirement for detailed descriptions of the work to be done, information about the site of the service, and the credentials of the professionals doing the work. Additionally, both forms may need details on the electrical load, the type of installation (e.g., new service, service upgrade), and a declaration or certification by the applicant acknowledging the compliance with relevant codes and standards.

  • The Building Permit Application form shares commonalities with the PECO Service And Meter Application form concerning its role in the construction and utilities setup process. While focusing on a broader scope of construction activities, it similarly gathers data on the project location, the type and scope of work, owner and contractor information, and often includes a section for utilities that might require coordination with local utility providers. This ensures that new structures or renovations align with public utility services like electricity, making it another crucial step in planning construction projects.

  • A Customer Connection Agreement often accompanies or follows a utility service application like the PECO Service And Meter Application form. This document outlines the terms and conditions under which the service will be provided, including but not limited to, rates, maintenance responsibilities, and service limitations. Both documents are integral in establishing a new or modified utility service. The Customer Connection Agreement further elaborates on the legal and financial responsibilities agreed upon in the initial application, ensuring both the customer and the utility provider are clear on their commitments.

Dos and Don'ts

When completing the PECO Service And Meter Application form, it's important to follow specific guidelines to ensure your application is processed smoothly. To help you with this, here is a comprehensive list of things you should and shouldn't do:

  • Do read through the entire set of instructions provided at the top of the application form before you start filling it out. This will give you a clear understanding of what's expected.
  • Do accurately locate and select the appropriate PECO regional office for your service request. This is crucial for ensuring your application is sent to the correct location for processing.
  • Do provide all required personal information, including your Name, Service Location, Customer's Driver's License Number or Social Security Number, as specified in the form.
  • Do make sure to include the electrician or contractor's Tax Identification Number if you are completing the form on behalf of a business. This is now a mandatory field.
  • Do clearly indicate the type of service you are requesting by properly filling out the sections on the type of request, service characteristics, and meter information.
  • Don't leave any mandatory fields blank. Incomplete information may cause delays in processing your application.
  • Don't use vague terms like "as soon as possible" for service request dates. Provide specific dates to avoid any confusion and facilitate timely service.
  • Don't forget to sign and date the application. An unsigned application is considered incomplete and will not be processed.

Following these guidelines will help ensure your application is complete and processed without unnecessary delays.

Misconceptions

When it comes to applying for electric service and meter installation or upgrades through the PECO Service and Meter Application form, there are several misconceptions that can confuse or mislead applicants. Understanding these misconceptions can streamline the application process and ensure a smoother transaction with PECO. Let's address seven common misunderstandings:

  • Misconception 1: The application is only for new electric service installations.

    Many people believe that the PECO Service and Meter Application is solely for requesting a brand-new electric service. However, this form is versatile and also used for load increases or decreases, service reintroductions, temporary services, service upgrades or changes, and even for demolitions requiring the removal of electric or gas facilities.

  • Misconception 2: All sections of the application must be completed by the customer.

    While it's essential for applicants to provide thorough and accurate information, certain sections of the form, specifically those towards the end detailing service characteristics and technical specifications, might require input from a professional electrician or contractor. This allows for accurate assessment and fulfillment of the service request based on technical needs.

  • Misconception 3: Submitting the application guarantees quick installation or service changes.

    Submitting the application is an important step, but processing times can vary based on the complexity of the request, demand, and other logistical factors. Additionally, incomplete information or failure to comply with PECO’s Electric Service Requirements might result in delays.

  • Misconception 4: The application is only necessary for permanent structures.

    The form accommodates a wide range of service requests, including those for temporary installations often required for construction sites, events, or other temporary needs, debunking the idea that services are only for permanent, fixed structures.

  • Misconception 5: Personal identification numbers are optional.

    A surprising number of applicants think providing a Social Security Number or Driver's License Number is optional. This information is crucial for identity verification and credit checks, especially for first-time customers or those who haven't had PECO service in the last 60 days.

  • Misconception 6: The application covers all necessary permits and inspections.

    While the application initiates the process for electric service and metering, it does not substitute for required local government permits or inspections. Compliance with city or municipal codes and obtaining relevant inspections lies with the applicant and their contractor.

  • Misconception 7: Service voltages are standardized and automatically compatible with any property.

    Not all service voltages are available in every area. Before proceeding with wiring or purchasing equipment, it's vital to confirm with PECO on the availability of the desired service voltage for your specific location to ensure compatibility and avoid unnecessary expenses or adjustments.

Understanding these misconceptions can significantly enhance applicants' experience with the PECO Service and Meter Application process by setting realistic expectations and helping them prepare comprehensive and accurate applications.

Key takeaways

Filling out the PECO Service And Meter Application form is a critical step for anyone seeking electric service for a new or existing property. This application is necessary for a variety of service requests, including new service installation, changes to an existing service, and more. Here are five key takeaways to ensure the process is completed effectively:

  • Before starting the application, applicants should determine the PECO regional office responsible for the area where the service is requested. This ensures that the application is directed to the appropriate office for processing, as indicated by checking the relevant box and using the contact details provided for mailing or faxing the completed form.
  • Applicant information required includes the customer's name, service location, and a form of identification, such as a Driver's License Number or Social Security Number. These details are crucial for PECO to establish the customer's account and ensure accurate billing.
  • For contractors or electricians filling out the form, it's mandatory to include their Tax Identification number, indicate where replies should be sent, and specify a preferred date for receiving the reply. This information facilitates efficient communication between PECO and the contractor or electrician involved in the project.
  • The application requires detailed information about the service being requested, including the type of request (e.g., new service, upgrade, demolition), characteristics of the service (e.g., residential or commercial, metering information), and specifics about the electrical load and motor information, if applicable. Clear and detailed responses help PECO understand the scope of the project and tailor the service to meet the customer's needs.
  • Submission of the completed application must comply with PECO's Electric Service Requirements manual and receive approval from a recognized inspection agency, especially for projects within Philadelphia, where coordination with Licenses & Inspections may be necessary. Additionally, applicants should inquire about service voltages available in their area and adhere to PECO's timelines regarding communication and the provision of requested services.

By closely following these guidelines, applicants can streamline the process of securing electric service, ensuring that their needs are met in a timely and efficient manner.